P. 2

Guttercrest




                                                                                                                                   goes back to school











                                                                                                                                   The Hammersmith Academy in London is a             Guttercrest Limited was involved from the conception
                                                                                                                                   co-educational school and 6th form specialising    stage of this building, working closely with the
                                                                                                                                   in creative and digital media and information      architects to design and engineer the complex
                                                                                                                                   technology. The state-of-the-art four storey building   bespoke aluminium cladding to the projecting eaves
                                                                                                                                   boasts facilities including a theatre, sports hall, library,   blades. Guttercrest devised a wraparound cladding
                                                                                                                                   fitness suite and digital editing and IT suites.   solution, providing the eaves with bold symmetrical
                                                                                                                                                                                      lines around the whole building and giving it an
                                                                                                                                   The site chosen for the Academy was a challenging   imposing feature.
                                                                                                                                   one as there was very limited external space other
                                                                                                                                   than a multi-use games area. Thus the Academy      Guttercrest also designed and manufactured the
                                                                                                                                   accommodation had to be housed on four floors –    aluminium rectangular column casings which are all
               A very modern makeover                                                                                              the sports hall is on the second – and the curriculum   around the building, together with all the aluminium
                                                                                                                                   had to be designed in such a way to offset any     copings and the aluminium fascia soffits to high-
                                                                                                                                   shortcomings as a result of the lack of external   level and walkway soffits; all of which were polyester
                                                                                                                                   recreation space.                                  powder coated to specification.
            In 2150 BC bluestones from the Preseli Mountains   Solutions. The unique perforations of the ZCM
            in South Wales were transported to the site of     panels were enabled by world-leading cutting and                                                                       The architect was BHM Architects Limited and the
            Stonehenge in west Amesbury near Salisbury nearly   routing machines; these combine with the foremost                                                                     main contractor was Wates Construction.
            240 miles away. It is thought these 82 stones, some   design and manufacturing software to produce all of
            weighing four tonnes each, were dragged on rollers   Euroclad’s products that utilise composite materials,
            and sledges and carried on rafts along the south   such as rainscreens, canopies and bullnoses.
            coast of Wales and up the rivers Avon and Frome,
            before being dragged overland again to the site we   Despite its low-key aesthetic, this building operates
            now know as Stonehenge. More than 4,000 years      extremely well and the Euroclad-manufactured
            later Euroclad products made a very similar journey   canopy creates an attractive transition from outside
            from South Wales to Wiltshire for installation on the   to in, dappling light through its routed perforations.
            new visitor centre constructed by English Heritage -   The ZCM canopy and walls act not only to contribute
            albeit this time it was via the M4 motorway.       to the overall effect of the building’s architecture but
                                                               also to achieve specific elements of the design.
            The new visitor centre at Stonehenge thankfully did
            not take quite as long to construct as the ancient   Stonehenge is one of the wonders of the world and
            stone monument itself.  In fact, the fast track    the best-known prehistoric monument in Europe.
            installation offered by Euroclad products helped   The new world-class visitor centre has transformed
            achieve the impressive design of the new building   the visitor experience, providing museum-quality
            within a challenging timeframe.                    permanent and temporary exhibitions, plus a
                                                               spacious shop and café.
            The visitor centre is 1.5 miles west of the stone
            circle and its design combines modest aesthetics   Stonehenge and Avebury became a World Heritage
            with excellent functionality in order to satisfy English   Site (WHS) in 1986 for their outstanding prehistoric
            Heritage’s long-held desire to create a building with   monuments which date from 3700 to 1600 BC.
            as little visual impact on the site as possible.     At Stonehenge, the unique lintelled stone circle is
                                                               surrounded by a landscape containing more than
            Zinc composite material (ZCM) was used to          350 burial mounds and major prehistoric monuments
            manufacture the soffits of the large canopy on the   such as the Stonehenge Avenue, the Cursus,
            new environmentally sensitive visitor centre, with the   Woodhenge and Durrington Walls.
            same material used to clad the interior and exterior
            walls; all of which were installed by Massey Cladding   Architect: Denton Corker Marshall