Page 9 - Metal-Matters-issue-10
P. 9

The Price Is Right   Shining A Light On




 For The National Grid  Rotherham’s New York Stadium










 Glancy Nicholls Architects of Birmingham are   Internally Slimwall can be finished in whatever the   Central to any football club are the fans’ match   made for shipment to New York, USA – is the new
 favoured by National Grid for their ability to design   client desires making this, and similar projects, proper   day experience and pitch quality, and it was with   long-term home for the Millers having played their
 buildings which have immense functionality, which   ‘Through-Wall Engineering’ projects.  these factors in mind that the spectacular rooflight   home games in Sheffield since leaving Millmoor
 look stunning, meet or exceed energy saving   canopy of Rotherham United’s £20 million New York   in 2008. Built to last, the panelling of clear Marlon
 performance criteria…. and which come in on   Fundamental to this type of system is not only the   Stadium was designed and built using over 4,800   CS Longlife polycarbonate is renowned for its
 budget.  system’s recurring ability to come in on budget, but   square metres of Brett Martin’s Marlon CS profiled   durability, comes with a co-extruded UV protection
 also to provide energy saving statistics which are the   polycarbonate sheet.  layer, and carries a 10 year light transmission with a
 National Grid at Hitchen is one of several National   envy of today’s construction sector.   three year weather breakage warranty so it should
 Grid projects where Glancy Nicholls has specified   As it is totally enclosed, it was important that the roof   be letting light onto their new home for years to
 Slimwall systems from Architectural Profiles Limited   This is one of two projects to provide practical and   design of the new 12,000-seater stadium allowed   come. Using the 2mm thick sheets as glazing to
 (APL) to meet the very exacting demands of their   class room training for new National Grid graduates.   natural light to penetrate through both onto the pitch   incorporate natural light into their design will help
 client.  The accommodation includes reception, offices,   and the stands. This ensures fans are able to enjoy
 ground floor workshops, and first floor classrooms   the sunshine and will cut Rotherham United FC’s   Rotherham United meet its sustainability targets as
 An APL AP45HR (half round) cladding profile was   arranged around a central atrium. These training   energy bill as artificial lighting will not be necessary   well as supplying home games with an exceptional
 specified for this project. It is the external face of   centres are the first buildings within the company to   during the day. Brett Martin’s daylight solutions will   appearance.
 a Slimwall Twinskin system into which matching   have low carbon footprints, thanks to the design of   also aid pitch maintenance, encouraging grass   The project was managed by Gleeds and building
 AP70LCP HR (half round) live louvers are integrated.   the external fabric, orientation and the inclusion of   growth in warmer months, and defrosting the pitch in   was undertaken by GMI Construction in collaboration
 An interesting use of AP45HR half round cladding   renewable energy resources.  the winter.  with roofing contractors, Roofdec.
 can be seen on a round services column at the rear
 of the building.   The New York Stadium – named after its location in
            the area of Rotherham in which fire hydrants were













































 8 8                                                                                                             9
   4   5   6   7   8   9   10   11   12   13   14